![]() To report any problems or concerns relating to the above-mentioned conditions contact the Street Department at (267) 536-1037 with the nearest street address or intersection and the location or you may send email. This material is then analyzed and recommendations are made which streets to pave for optimum cost benefit. ![]() The information gathered consists of length and width of cracks, severity of weathering, number of potholes, patches, bumps, sags and other distress. Each year information from random sample sections of numerous streets are collected. Overlay is usually done during the summer months. The street resurfacing schedule is coordinated with all other township departments and all private utility companies' planning projects in effected right of ways. The streets resurfacing schedule is based on the condition of the roadway and the volume of traffic. This program provides for resurfacing of streets to improve riding comfort, reduce the need for maintenance and increase the life of the street.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |